SEARCH
 Advanced Search:

Privacy Policy

SEARCH RESULTS
There are 3 (1 pages of) events that match your search criteria.
1  
IMAGE NAME DESCRIPTION
DISTANCE
Sir Francis Drake at Home
22/08/2010
Sir Francis Drake at Home
Meet the man himself, marvel at his weapons and hear stories from the ocean waves. 32.2 miles
Saltfest
22/08/2010
Saltfest
A free music Festival in Saltash. all venues are free to attend other than the Damned playing at Liv... 37.72 miles
Experience life in a Tudor Home
22/08/2010
Experience life in a Tudor Home
Experience life in the 15th century at this enchanting, Grade 2 listed, cottage, reputed to be the o... 37.86 miles
 
 
 
 
Local Weather:
Sunday: light rain shower, Max Temp: 20°C (68°F), Min Temp: 14°C (57°F) Max Temp: 20°C (68°F), Min Temp: 14°C (57°F), Wind Direction: SE, Wind Speed: 15mph, Visibility: moderate, Pressure: 1016mb, Humidity: 92%, UV risk: low, Pollution: moderate, Sunrise: 06:34BST, Sunset: 19:50BST Monday: heavy rain, Max Temp: 18°C (64°F), Min Temp: 12°C (54°F) Max Temp: 18°C (64°F), Min Temp: 12°C (54°F), Wind Direction: SSE, Wind Speed: 16mph, Visibility: poor, Pressure: 1003mb, Humidity: 97%, UV risk: low, Pollution: low, Sunrise: 06:36BST, Sunset: 19:48BST Tuesday: heavy rain shower, Max Temp: 18°C (64°F), Min Temp: 9°C (48°F) Max Temp: 18°C (64°F), Min Temp: 9°C (48°F), Wind Direction: WSW, Wind Speed: 9mph, Visibility: poor, Pressure: 999mb, Humidity: 72%, UV risk: low, Pollution: low, Sunrise: 06:37BST, Sunset: 19:46BST
Local Traffic:
M5 Gloucestershire | Northbound | Roadworks, road closed The M5 northbound entry slip at junction J10 will be closed , due to roadworks, from 8 pm on 6 September 2010 to 6 am on 7 September 2010. M50 Gloucestershire | Westbound | Roadworks, road closed The M50 westbound will be closed between junctions J2 and J4, due to roadworks, between 8 pm and 6 am, from 8 September 2010 to 10 September 2010. M50 Gloucestershire | Westbound | Roadworks, road closed The M50 westbound entry slip at junction J2 will be closed , due to roadworks, between 8 pm and 6 am, from 8 September 2010 to 10 September 2010. M48 Gloucestershire | Westbound | Roadworks On the M48 westbound between junctions J1 and J2, minor delays are possible due to roadworks . Expect disruption until 7:00 pm on 6 September 2010. A303 Wiltshire | Westbound | Roadworks On the A303 westbound between the junctions with the A338 and the A345, minor delays are possible due to roadworks . Expect disruption until 11:59 pm. A303 Wiltshire | Eastbound | Roadworks On the A303 eastbound between the junctions with the A345 and the A338, minor delays are possible due to roadworks . Expect disruption until 11:59 pm. M48 Gloucestershire | Eastbound | Roadworks, 1 lane closed On the M48 eastbound between junctions J2 and J1, minor delays are possible due to roadworks closing one lane. Expect disruption until 7:00 pm on 24 September 2010. A30 Cornwall | Westbound | Roadworks On the A30 from Honiton towards Penzance between the junctions with the A39 South and the A3047 Redruth East , there are currently delays of 10 mins due to roadworks . Expect disruption until 6:00 am on 28 March 2011. A30 Cornwall | Eastbound | Roadworks On the A30 from Penzance towards Honiton between the junctions with the A3047 Redruth East and the A39 South, there are currently delays of 10 mins due to roadworks . Expect disruption until 6:00 am on 28 March 2011. A30 Cornwall | Eastbound | Roadworks On the A30 from Penzance towards Honiton between the junctions with the A3047 Camborne West and the A3047 Redruth East , minor delays are possible due to roadworks . Expect disruption until 6:00 am on 6 September 2010. A30 Cornwall | Westbound | Roadworks On the A30 from Honiton towards Penzance between the junctions with the A3047 Redruth East and the A3047 Camborne West , minor delays are possible due to roadworks . Expect disruption until 3:00 pm on 6 September 2010. A30 Cornwall | Westbound | Roadworks On the A30 from Honiton towards Penzance between the junctions with the A3047 Redruth East and the A3047 Camborne West , minor delays are possible due to roadworks . Expect disruption until 6:00 am on 6 September 2010. A30 Cornwall | Eastbound | Roadworks On the A30 from Penzance towards Honiton between the junctions with the A3047 Camborne West and the A3047 Redruth East , minor delays are possible due to roadworks . Expect disruption until 6:00 am on 6 September 2010. M5 Worcestershire | Southbound | Roadworks On the M5 southbound between junctions J8 and J9, there are currently delays of 10 mins due to roadworks . Expect disruption until 12:00 am on 22 December 2010. M5 Worcestershire | Northbound | Roadworks On the M5 northbound between junctions J9 and J8, there are currently delays of 10 mins due to roadworks . Expect disruption until 12:00 am on 22 December 2010. M5 Gloucestershire | Northbound | Roadworks On the M5 northbound at junction J9, there are currently delays of 10 mins due to roadworks . Expect disruption until 6:00 am on 6 September 2010. M5 Gloucestershire | Southbound | Roadworks On the M5 southbound at junction J9, there are currently delays of 10 mins due to roadworks . Expect disruption until 6:00 am on 6 September 2010. M5 Worcestershire | Northbound | Roadworks On the M5 northbound between junctions J9 and J8, minor delays are possible due to roadworks . Expect disruption until 6:00 am on 14 July 2010. M5 Worcestershire | Southbound | Roadworks On the M5 southbound between junctions J8 and J9, minor delays are possible due to roadworks . Expect disruption until 6:00 am on 14 July 2010. M5 Gloucestershire | Northbound | Roadworks On the M5 northbound at junction J9, there are currently delays of 10 mins due to roadworks . Expect disruption until 6:00 am on 6 September 2010. M5 Gloucestershire | Southbound | Roadworks On the M5 southbound at junction J9, there are currently delays of 10 mins due to roadworks . Expect disruption until 6:00 am on 6 September 2010. M5 Somerset | Southbound | Roadworks, 1 lane closed On the M5 southbound between junctions J23 and J24, minor delays are possible due to roadworks closing one lane. Expect disruption until 7:00 am on 6 September 2010. A38 Cornwall | Northbound | Roadworks On the A38 from Bodmin towards Exeter between the junctions with the A374 Liskeard and the A388, minor delays can be expected at peak times due to roadworks , between 7:30 am and 6 pm, from 20 August 2010 to 10 September 2010. M5 Devon | Southbound | Roadworks, 1 lane closed On the M5 southbound exit slip at junction J30 , minor delays are possible due to roadworks closing one lane. Expect disruption until 7:00 am on 6 September 2010. M4 Wiltshire | Eastbound | Roadworks On the M4 eastbound between junctions J15 and J14, expect delays of up to 10 mins at peak times due to roadworks , between 10 pm and 6 am, from 2 September 2010 to 9 September 2010. M5 North Somerset | Southbound | Roadworks On the M5 southbound exit slip at junction J19 , minor delays are possible due to roadworks . Expect disruption until 6:00 am on 6 September 2010. M5 North Somerset | Northbound | Roadworks On the M5 northbound exit slip at junction J19 , minor delays are possible due to roadworks . Expect disruption until 6:00 am on 6 September 2010. M5 North Somerset | Northbound | Roadworks On the M5 northbound between junctions J22 and J21, expect delays of up to 10 mins at peak times due to roadworks , between 9 pm and 7 am, from 5 September 2010 to 17 September 2010. M5 Gloucestershire | Southbound | Roadworks On the M5 southbound between junctions J13 and J14, expect delays of up to 10 mins at peak times due to roadworks , from 8 pm on 6 September 2010 to 6 am on 8 September 2010. M5 Gloucestershire | Northbound | Roadworks On the M5 northbound between junctions J14 and J13, expect delays of up to 10 mins at peak times due to roadworks , between 8 pm and 6 am, from 6 September 2010 to 8 September 2010. M5 Gloucestershire | Northbound | Roadworks, road closed The M5 northbound exit slip at junction J12 will be closed , due to roadworks, between 8 pm and 6 am, from 6 September 2010 to 15 December 2010. M5 Devon | Southbound | Roadworks, road closed The M5 southbound entry slip at junction J27 will be closed , due to roadworks, from 8 pm on 6 September 2010 to 5 am on 7 September 2010. M5 Somerset | Southbound | Bridge repairs, 2 lanes closed On the M5 southbound between junctions J25 and J26, expect delays of up to 10 mins at peak times due to bridge repairs closing two lanes, from 7 pm on 7 September 2010 to 6 am on 8 September 2010. M5 Gloucestershire | Southbound | Roadworks On the M5 southbound between junctions J13 and J14, expect delays of up to 10 mins at peak times due to roadworks , between 8 pm and 6 am, from 7 September 2010 to 9 September 2010. M5 Gloucestershire | Northbound | Roadworks On the M5 northbound between junctions J14 and J13, expect delays of up to 10 mins at peak times due to roadworks , between 8 pm and 6 am, from 7 September 2010 to 9 September 2010. M5 Bristol | Southbound | Roadworks, road closed The M5 southbound will be closed between junctions J18 and J20, due to roadworks, between 8 pm and 5 am, from 7 September 2010 to 8 September 2010. M4 South Gloucestershire | Eastbound | Roadworks On the M4 eastbound between junctions J18 and J17, expect delays of up to 10 mins at peak times due to roadworks , between 8 pm and 5 am, from 8 September 2010 to 9 September 2010. M4 South Gloucestershire | Westbound | Roadworks, 2 lanes closed On the M4 westbound between junctions J17 and J18, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 9 pm and 5 am, from 8 September 2010 to 9 September 2010. M5 South Gloucestershire | Southbound | Roadworks, 2 lanes closed On the M5 southbound between junctions J14 and J15, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 7 pm on 9 September 2010 to 5:30 am on 10 September 2010. M4 South Gloucestershire | Eastbound | Roadworks, 2 lanes closed On the M4 eastbound between junctions J18 and J17, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 8 pm and 5 am, from 9 September 2010 to 10 September 2010. M4 South Gloucestershire | Westbound | Roadworks, 2 lanes closed On the M4 westbound between junctions J17 and J18, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 9 pm and 5 am, from 9 September 2010 to 10 September 2010. M4 South Gloucestershire | Eastbound | Roadworks, 2 lanes closed On the M4 eastbound between junctions J18 and J17, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 9 pm and 5 am, from 10 September 2010 to 11 September 2010. M4 South Gloucestershire | Westbound | Roadworks, 2 lanes closed On the M4 westbound between junctions J17 and J18, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 11 pm and 5 am, from 10 September 2010 to 11 September 2010. A38 Devon | Southbound | Roadworks, road closed The A38 from Exeter towards Bodmin will be closed between the junctions with the A30 and the A379, due to roadworks, between 8 pm and 2 am, from 16 September 2010 to 17 September 2010. M5 Devon | Southbound | Roadworks, road closed The M5 southbound exit slip at junction J31 will be closed , due to roadworks, from 8 pm on 16 September 2010 to 6 am on 17 September 2010. A38 Devon | Southbound | Roadworks, 3 lanes closed On the A38 from Exeter towards Bodmin at the junction with the A30, expect delays of up to 10 mins at peak times due to roadworks closing three lanes, from 8 pm on 16 September 2010 to 6 am on 17 September 2010.